Clicky

Raja Numan

Raja Numan

Hi, My name is Engr. Raja Numan author of Engineering Information Hub and I am a Civil Engineer by Profession and I've specialized in the field of Quantity Surveying, Land Surveying as QC Engineer in national and multinational companies of Pakistan & Saudi Arabia.
  • Civil Engineering

    How to Calculate the Quantity of Road Asphalt

    Calculation of Asphalt amount Estimate the quantity of asphalt required, mistreatment geometrical formulas and plans or measurements, together with breadth, length, and depth (thickness), Estimate the density of the recent combine to be used. Example:– Calculate asphalt for 50m long road has 15m breath take 15cm as thickness. ignore camber use 2330 kg/cu.m dense asphalt. Solution:- LEARN MORE What Square…

    Read More »
  • Civil Engineering

    Resection Method in Civil & Land Surveying

    Resection Method in Surveying  A- The method of locating a point P from at least three known points K, L, and M without having occupied the known points is called resection. B- In this system, only the point to be determined is occupied, and the angles between the known stations are measured. C- A minimum of three known points is required…

    Read More »
Back to top button
error: Content is protected !!