Resection
-
Civil Engineering
Resection Method in Civil & Land Surveying
Resection Method in Surveying A- The method of locating a point P from at least three known points K, L, and M without having occupied the known points is called resection. B- In this system, only the point to be determined is occupied, and the angles between the known stations are measured. C- A minimum of three known points is required…
Read More »